PAGE 1
Owner's Manual & Assembly Instructions M01 Model No. WH109-A Missing Parts, Questions on Assembly? Call: 1-800-851-1085 Do not return to dealer, they are not equipped to handle your requests. 708670310 Storage Area: 84 Sq. Ft. 7,8 m2 553 Cu. Ft. 15,7 m3 BUILDING DIMENSIONS * Size rounded off to the nearest foot *Approx. Size Base Size 10' x 9' 121" x 105" 3,0 m x 2,6 m 307,3 cm x 266,7 cm Exterior Dimensions (Roof Edge to Roof Edge) Width Depth Height CAUTION: SOME PARTS HAVE SHARP EDGES.
PAGE 2
BEFORE YOU BEGIN.... A2 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Instructions are supplied in this manual and contain all appropriate information for your building model.
PAGE 3
PLAN AHEAD.... A3 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools. Teamwork: These are some basic tools and materials you will need for the construction of your building.
PAGE 4
SAFETY FIRST.... A4 Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. •Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
PAGE 5
CARE & MAINTENANCE.... A5 Web For long lasting finish, periodically clean and wax the exterior surface. Touchup scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Finish: Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
PAGE 6
ACCESSORIES.... A6 WEB ROOF STRENGTHENING (heavy snow load) KITS FLOOR FRAME KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground.
PAGE 7
THIS PAGE WAS LEFT BLANK INTENTIONALLY 7
PAGE 8
THIS PAGE WAS LEFT BLANK INTENTIONALLY 8
PAGE 9
Base K09 The Base For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB109-A or 68385-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow 1 - 2 hours for construction.
PAGE 10
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. Anchoring into Wood/Post: Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring. 1. 2.
PAGE 11
Hardware M11 Remove from bag of screws and save for the last step 65103 #8-32 Hex Nut (239) 65900A #10Bx1/2" (13 mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10 mm) Bolt (225) 65004 #8Ax5/16" (8 mm) Screw (382) 66045 Handle (2) 66646 Washer (293) (8 sheets of 40) 65109 #8-32 Acorn Nut (14) (Packed with Screws) 67468 Peak Cap (6) (Arrow Logo) 66769 Door Slide (4) 66382 Lower Door Guide (4) 66183 Roof Trim Cap (2 right & 2 left) 65020 1/4" (6 mm) Door Washer (14) (Packed with Screws
PAGE 12
Parts List M12 Assembly Key # Part Number Part Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 12 5986 6085 6114 6115 6227 6403 6636 10501 7858 7859 7860 7952 7953 7954 8109 8715 8716 8717 8718 8734 8740 8742 8743 10517 10517 8934 8936 8945 10509 10509 9003 9004 9005 9006 9007 5291 8737 5320 8735 5307 8736 9365 9366 9367 67730 67521 Rear Wall Angle Roof Beam Bracket Small Right Gable Small Left Gable Roof Beam Br
PAGE 13
Assembly by Key No.
PAGE 14
Step 1 ● 8934 Ramp (1) ● 9367 Front Floor Frame (2) ● 8936 Rear Floor Frame (2) ● 8945 Side Floor Frame (4) ● Parts Needed For ● Floor Frame Assemblies K14 The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front.
PAGE 15
Step 2 ● 5986 Rear Wall Angle (2) ● 8740 Side Wall Angle (4) ● 9004 Right Side Wall Channel (2) ● 9005 Left Side Wall Channel (2) ● 9006 Right Rear Wall Channel (1) ● 9007 Left Rear Wall Channel (1) ● Parts Needed For ● Frame Assemblies M15 The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall.
PAGE 16
● Parts Needed For ● Step 3 Roof Beam Assemblies ● 10517 Roof Beam (12) M16 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together.
PAGE 17
● Parts Needed For ● Step 4 Door Track Assembly ● 6403 Door Track Splice (1) ● 9366 Door Track (2) A17 NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 6403 1 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 2 Insert four screws from the under- 66769 9366 9366 side only.
PAGE 18
Step 5 ● Front Floor Assembly (1) ● Side Floor Assembly (2) ● Rear Floor Assembly (1) ● Parts Needed For ● Floor Frame K18 RIGHT REAR 8945 1 Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. STEP 8936 1 RIGHT FRONT FR ON T 8945 9367 2 Measure the floor frame diagonally. When the diagonal measurements are equal, the floor frame is square.
PAGE 19
Step 6 ● 8716 Right Corner Post (2) ● 8715 Left Corner Post (2) ● Door Track Assembly (1) ● Side Wall Angle Assembly (2) ● Rear Wall Angle Assembly (1) ● Parts Needed For ● Posts/Top Frames M19 NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds.
PAGE 20
● Parts Needed For ● Step 7 ● 8718 Rear Splice Post (1) ● 8734 Side Splice Post (2) ● 8717 Door Jamb (2) Splice Post/Door Jamb M20 STEP 1 The door jambs reinforce the door opening and provide an attractive trim. The splice posts support the wall. ANGLED END OF SPLICE POST MUST BE ON TOP 8734 1 Position a rear splice post at the 8718 center of the rear wall and fasten using bolts and nuts into rear wall angle and screws into rear floor frame.
PAGE 21
● Parts Needed For ● Step 8 Mid Frames/Studs ● Side Wall Channel Assemblies (2) ● Rear Wall Channel Assembly (1) ● 9003 Stud (6) ● 9365 Front Wall Channel (2) M21 1 Wearing gloves, bend the 2 tabs on each mid wall channel down. 2 Fasten side wall channel assemblies to the sides of building at the splice and corner posts using screws. STEP 1 3 Fasten the rear wall channel as- BEND 2 TABS DOWNWARD sembly across the rear of building overlapping side channels and fasten rear corners using screws.
PAGE 22
● Parts Needed For ● Step 9 Side/Rear/Front Siding M22 ● 8735 Side Siding (5 board) (8) ● 5320 Side Siding (3 board) (4) ● 8736 Rear Siding (5 board) (4) ● 5307 Rear Siding (3 board) (2) ● 8737 Front Siding (5 board) (4) ● 5291 Front Siding (3 board) (2) Each screw in the wall requires a washer. CORRECT INCORRECT 1 Slide side siding (5 board) into channels of corner and splice posts, flat edge upward, slotted edge down resting on floor frame. Always follow this pattern.
PAGE 23
Step 10 ● ● ● ● ● ● ● Parts Needed For ● Gable Assemblies M23 7858 Large Right Gable (2) 7859 Large Left Gable (2) 6114 Small Right Gable (2) 6115 Small Left Gable (2) 6085 Roof Beam Bracket (4) 7860 Mid Gable Brace (4) 67521 Edge Trim (Plastic Piece) The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing.
PAGE 24
● Parts Needed For ● Step 11 Gables/Roof Beams ● Left Gable Assemblies (2) ● Right Gable Assemblies (2) ● Single Roof Beam (4) ● 6636 Gable Brace (2) M24 1 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the front gable, leave out 2 screws closest to center gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle.
PAGE 25
Step 12 ● Parts Needed For ● Roof Beam/Braces ● Main Roof Beam (1) ● 6227 Roof Beam Brace (2) K25 1 Fasten the track supports to the STEP 1 front gable assembly only, as shown. 2 Wrap the weather stripping tape around the two joined edges of the large left and right gables. See diagram. Cut the weather stripping to length and repeat on next gable set. Track Supports 6228 STEP 3 Spread the two halves of the main 2 roof beam and fasten the roof beam to the gable brace of the front gable.
PAGE 26
Step 13 ● Parts Needed For ● ● 7952 Right Roof Panel (1) Right Roof Panel M26 Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer. STEP 1 NOTE If a Roof Beef-Up Kit was purchased, assemble prior to attaching the roof panels.
PAGE 27
Step 14 ● Parts Needed For ● ● 7953 Left Roof Panel (1) ● 7954 Roof Panel (4) Roof Assembly M27 Screws To Roof Beam 1 Install a left roof panel at the left rear corner of the roof. Fasten At Overlap With Bolt Fasten At Overlap With Bolt 2 Install four roof panels in the sequence and positions shown on previous page. Follow fastener sequence and instructions in Steps 13 thru 15 while fastening roof panels.
PAGE 28
● Parts Needed For ● Step 15 ● 8742 Ridge Cap (6) ● 7953 Left Roof Panel (1) ● 7952 Right Roof Panel (1) Ridge Caps & Panels M28 1 Install three ridge caps on the completed roof section using bolts and nuts. Do not fasten the ends of ridge caps until instructed to do so. STEP 1 8742 2 Fasten the remaining left and right 8742 8742 roof panels as you unroll the weather stripping tape, and press it down, install the second ridge caps overlapping the first ridge caps.
PAGE 29
● Parts Needed For ● Step 16 Roof Trim ● 8743 Side Roof Trim (4) M29 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap. 2 Using your thumb and index finger, overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners. 3 Fasten the roof trim caps to the side trim using a screw.
PAGE 30
Step 17 ● Parts Needed For ● Door Assembly M30 The steps on this page tell how to assemble the left door. You will perform exactly the same procedures for the right door. Each bolt requires a small washer on the outside of the door. Proceed as follows: ● 67730 Foam Board (2) ● 10509 Right and Left Doors (2) ● 10501 Horizontal Door Brace (4) ● 8109 Vertical Door Brace (2) 10509 Right Door 10501 10509 Left Door STEP 10501 1 Place foam board under the lip of STEP 5 door.
PAGE 31
Step 18 ● Parts Needed For ● ● Right Door Assembly (1) ● Left Door Assembly (1) Door Installation & Adjustment Y31 Horizontal Door Brace Gable Door Track Door Slide 1 Door From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. STEP STEP 1 2 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
PAGE 32
WH109-A M32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use.